The 900t Special Launching Carrier fabricated for CCCC Second Highway Engineering Co., Ltd. started site assembly in Tiayuan-Jiaozuo Highspeed Railway Passenger's Line.
Tiayuan-Jiaozuo Highspeed Railway Line has a total length of 362.095km. There is 328.178km in Shanxi Province and 33.917km in Henan Province. The project started on June of 2016 and will be finished in the end of 2020.