On 26th December, 2017, the first super bridge of He-an highspeed railway project constructed by China Railway Beijing Enginnering Group Co., Ltd finished erection wiith the last piece of 24m box girder being placed onto the bridge pier.
The equipment and jobsite service staff from Tolian made great contributions to the construction of this bridge.